  • RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

    Hi Chris

     

    We have sent multiple inquiries over the past few months regarding the shipping status of our equipment but have not received a timeline. Don’t really know what is causing the delay for months.

     

    Could you please take the time to provide a firm date of delivery?

     

    Thank you

     

     

     

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Wednesday, July 22, 2026 1:53 PM
    To: Rodarte, Federico - MEX; Sosa, Rosa - MX
    Cc: Castillo, Ricardo - MX; Ortega, Estela - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX; Velazquez, Kevin - MEX; info@turnpack.com; catchall@turnpack.com
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Federico,

    Yes, I am receiving your emails. I owe you an explanation and an apology.

    I replied on Tuesday, July 21 confirming the shipment and install plan. I have since found that reply sitting in our own internal inbox - I hit reply on an internal copy of your message instead of the original, so it never left our system. That is on me. I also owe Rosa an answer from June 26 that I never sent, and I owe you the flight itinerary I promised. All of that is addressed below.

    BUILD STATUS
    The antistatic lid - the last outstanding hardware item - has been received and installed. The machine is complete. Remaining work is final functional testing before crating.

    SCHEDULE
    We are targeting shipment to WTS in El Paso by the end of this week, Friday, July 24. Being straight with you: there is a realistic chance it slips to Monday or Tuesday, July 27-28.
    I am holding the week of July 27 to be on-site in Juarez for installation, commissioning, and operator training, with the week of August 3 as the fallback if the crate does not clear in time. I will send my flight itinerary as soon as the ship date is locked, and no later than Friday, July 24.

    CUSTOMS DOCUMENTATION - ROSA
    Rosa, on June 26 you asked for certificate of origin, value, and technical data sheet. That request went unanswered for far too long and I apologize. Attached:

    • Certificate of Origin (USMCA / T-MEC certification format)
    • Commercial invoice showing declared value
    • D5L6 Technical Data Sheet


    Two things I need back from you to complete the certification of origin:

    1. Spectrum Control de Mexico's RFC and registered address, for the importer block
    2. Confirmation of the 6-digit HS tariff classification your broker uses for this equipment


    Please also tell me if your broker needs anything beyond these three documents. Since you noted clearance typically runs about two days with documents in hand, I want everything in your possession before the crate arrives at WTS rather than after.

    SHIPMENT DETAILS
    Shipping to your broker warehouse as previously confirmed:

    Spectrum Control, De Mexico
    C/O WTS Corporation Inc.
    9540 Joe Rodriguez
    El Paso, TX 79927


    Crate dimensions and gross weight: TBD
    The machine is 141 lbs and is a two-person lift, so no forklift is required once the crate is open.

    Two asks so we can lock my on-site days precisely:

    • Confirm WTS receiving hours and whether they need advance notice of delivery
    • Once it crosses, tell me the date it lands in Juarez. If it clears faster than expected I will move my trip up rather than have the machine sit.


    INSTALLATION AND TRAINING - WHAT WE NEED FROM YOUR SIDE

    Federico, you asked about this on June 22 and I did not answer it properly. The attached site preparation sheet has the full detail. The essentials:

    • Power: 110 V, 60 Hz, single phase, standard NEMA 5-15 outlet within reach of the rear panel. Your facility supply works as-is; no transformer or adapter is required. Please use a circuit separate from sensitive instrumentation, as the machine cycles motors frequently.
    • Bench: solid, level, non-vibrating, rated 250 lbs or more
    • Machine footprint: 24 in W x 22 in D x 14 in H
    • Clear work area: roughly 30 in W x 24 in D x 26 in H, with room to rotate the machine for rear access
    • ESD ground point at the bench, plus bench space for the particle-control vacuum unit
    • In or adjacent to a microelectronics clean room; ambient at or below 40 C and 90 percent RH

    No compressed air, nitrogen, or water is required - this is a dry process. No vent or exhaust either; the particle-control vacuum is a self-contained ULPA-filtered unit.

    Plan on one to two days on site: uncrating and placement, power-up and commissioning, recipe setup on your parts, operator training on the new touchscreen interface, and basic maintenance and troubleshooting.

    Please have ready:

    - The operators and maintenance technicians who should attend, so we can schedule around your production
    - Sample devices for process validation - at least two of each package type you intend to run

    Please complete and return the site preparation sheet at your earliest convenience.

    GOING FORWARD
    Every update from me goes to this full distribution. If you do not hear back from me within one business day, call my cell at +1 (480) 273-4686 and I will pick up.

    Ship date and itinerary to you by Friday.

    Chris

    Christopher Berger
    Turnpack, LLC
    Office: +1 (480) 331-1878
    Cell: +1 (480) 273-4686
    cberger@turnpack.com | https://www.google.com/url?q=http://www.turnpack.com&source=gmail&ust=1784836118280000&sa=E
    6922 E Via Northgate, Suite 2, Mesa, AZ 85212

     

    On Wed, Jul 22, 2026 10:44 AM, "Rodarte, Federico - MEX" <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hi Christopher, good morning.

     

    Are you receiving my E-mails?

     

    Please confirm.

     

    Thanks

     

    From: Rodarte, Federico - MEX
    Sent: Monday, July 20, 2026 7:05 AM
    To: Christopher Berger
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX; Velazquez, Kevin - MEX; Sosa, Rosa - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hi Christopher, good morning, can you please update and share status?

     

    Thanks.

     

     

    From: Rodarte, Federico - MEX
    Sent: Monday, July 13, 2026 7:27 AM
    To: Sosa, Rosa - MX; Christopher Berger
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX; Velazquez, Kevin - MEX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hi Christopher, good morning, can you please update and share status?

     

    Thanks.

     

     

    From: Sosa, Rosa - MX <Rosa.Sosa@am.spectrumcontrol.com>
    Sent: Friday, June 26, 2026 2:30 PM
    To: Rodarte, Federico - MEX; Christopher Berger
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX; Velazquez, Kevin - MEX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

     

    Good afternoon,

     

    We need certificate of origin, value, and technical data sheet.

     

    Thanks.

    From: Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com>
    Sent: Friday, June 26, 2026 2:25 PM
    To: Christopher Berger; Sosa, Rosa - MX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Thanks Christopher, Customs clearance usually takes no more than 2 days (Rosa Sosa to confirm timing and needs of information in advance).

     

    Thanks

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Friday, June 26, 2026 1:24 PM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Federico,

    The machine is built and the new control system is installed. Two things remain: we're finishing commissioning of that control system — the motion tuning, recipe setup, and final functional testing on the actual machine — and one last hardware item, the antistatic lid, which installs last and is due in early next week. This control system is the new Beckhoff platform that replaces the obsolete design, and I won't ship until it runs as needed on your floor. We are close to wrapping up.

    Because I've given your team enough moving ship dates, I commit to what I control directly and can prove: I will be on-site at your plant to finish installation, commission the machine, and train your operators myself.

    I am booking travel today to be on-site the week of July 27. I'll forward my flight itinerary once ticketed so you can see it's firm. The machine docks out ahead of that, and I'll send the exact ship date the moment it's crated.

    One ask so we can lock my exact on-site days together: since your team handles the El Paso-to-Juarez importation through WTS, can you confirm your typical clearance and cross time from the broker? If the machine clears earlier than expected, I'll move my trip up — I'd rather be there the week of July 20th or 13th.

    I will finish this last stretch correctly and close it out in person.

    Chris

     

    On Thu, Jun 25, 2026 at 2:51 PM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hi Cristopher, any update?

     

    Thanks

     

    From: Rodarte, Federico - MEX
    Sent: Monday, June 22, 2026 8:30 AM
    To: 'Christopher Berger'
    Cc: 'Info at Turnpack'; 'LLC SO2524915 Turnpack'; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hi Christopher, good morning, anxious to see this week update to stay on target 06/26?

     

    Also asking what do you need from our side in regards of the “Installation and Training” plan?

     

    Thanks, please advise…

     

    From: Rodarte, Federico - MEX
    Sent: Monday, June 8, 2026 9:23 AM
    To: 'Christopher Berger'
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Excellent, thanks!

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Monday, June 8, 2026 9:19 AM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Federico,

     

    Attached is the updated project schedule. We are still on target for the 06/26 ship date. This week will be critical as we finalize motor integration testing. I will provide another update on Friday.

     

    Chris

     

     

     

    On Tue, May 19, 2026 at 6:19 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Thanks for the update.

     

    Regards

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Tuesday, May 19, 2026 7:15 AM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Federico,

    Attached is the updated project schedule (Rev. 2) reflecting last Week's  progress. Every long-lead item is confirmed and on plan:

    • Beckhoff hardware: confirmed arrival this week
    • Applied Motion motor: confirmed by 5/25
    • Antistatic lid: ordered, 4-week lead, ships direct to AZ for final install
    • Chicago Dial Indicators: confirmed arrival before 6/1
    • Coatings: shipping to vendor this week
    • CAD released for in-house parts, fabrication in progress

    6/26/2026 ship to your WTS broker in El Paso remains the committed date.

    Next update is Friday, 5/22, focusing on the Beckhoff bench code dev kickoff and the Applied Motion motor arrival.

    Chris

     

     

     

    On Mon, May 11, 2026 at 5:27 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hi Christopher, thanks for the detailed status.

     

    Being a 6/26 a firm target date we will then NOT pursue the loaner, not to distract a 100% hand on in our machine.

     

    We can wait until, just make sure that 6/26 is a final ETS.

     

    Thanks

     

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Monday, May 11, 2026 6:08 AM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Federico,

    I told you Friday for the schedule. It's attached now instead. From this point forward you'll get answers ahead of the question.

    Committed ship date to your WTS broker in El Paso: Friday, June 26, 2026.

    The attached one-page schedule shows every workstream and milestone supporting that date. Quick summary of the path:

    • The original X-stage drive motor is obsolete and the supplier's last-time-buy did not materialize. We have redesigned the motion control around Applied Motion drive motors and a Beckhoff industrial PC with touchscreen HMI. This permanently eliminates the obsolescence risk and adds two capabilities the original Midas design did not have: touchscreen operation and recipe management.
    • Beckhoff hardware arrives in-house this week, which lets us develop the PLC, HMI, and recipe code on the bench in parallel with mechanical assembly at our build partner's shop. On-machine integration is therefore compressed to one week of motion tuning and commissioning.
    • All other components have been received, are on order with confirmed dates, or are moving through machining and coating this week.

    I am chasing four items today and will close them out in Friday's update:

    • Applied Motion supplier ship date confirmation
    • Antistatic lid PO placement and lead time
    • Chicago Dial Indicator items (PO26121668) confirmed ETA
    • Beckhoff arrival confirmation upon receipt this week

    Loaner system: there is no cost to Spectrum. Turnpack covers freight both directions and any duty. If you'd like the loaner shipped this week to bridge the gap until 6/26, confirm and we'll proceed. If not, all hands stay on your machine.

    Cadence going forward: written status from me every Friday morning until ship, covering parts received that week, build and test progress, and any schedule change the moment we see it — not after you ask.

    The communication gaps on this build were on me. The technical path is solid and you'll see that reflected in the weekly updates starting this Friday.

    Chris

     

     

     

    On Thu, May 7, 2026 at 5:26 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    OK Christopher, thanks for replying.

     

    Noted, will wait on tomorrow’s status to see gaps on supplying the new machine, after that will make a call if continue with a loaner or not. I mean if the new machine ETA is kind of within a couple of weeks, will wait… will see then by the new dates are available.

     

     

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Wednesday, May 6, 2026 10:24 PM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Federico,

    You're right, and I owe you a straight answer rather than another general update.

    I am not going to give you a ship date tonight that I can't stand behind. You will have one Friday morning, in writing, with the supporting milestones so you can hold us to it. Here is what I can confirm now:

    - The X-stage drive motors used in the original Midas design are obsolete with no last-time-buy available. We have redesigned the motion control around Applied Motion motors/drives and a Beckhoff industrial PC with touchscreen HMI. This removes the obsolescence risk permanently and adds touchscreen operation and recipe management that the original Midas design did not have.
    - Motors, drives, IPC and panel are all on order. Friday's update will include confirmed delivery dates from each supplier, the resulting ship date with float, and the build/test milestones in between.
    - After Friday, you will receive a written status from me every Friday morning until the machine ships — parts received that week, build/test progress, and any schedule change the moment we see it, not after you ask.

    Loaner: there is no cost to Spectrum. Turnpack covers freight both directions and any duty. If you want it shipped next week to bridge the gap, confirm and we'll proceed. If not, we'll put all hands on your machine.

    The communication gaps on this build are on me. The technical path forward is sound and you'll see that reflected in the cadence starting Friday.

    Chris

     

    On Tue, May 5, 2026 at 8:43 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hi Christopher, we, as customers want you to take the initiative to be one step ahead and to provide info not only when we asked for, which is what happens now.

    We need our machine, upgraded or not, you committed to a quote and sell t, and pushed out time after time is causing us trouble to fulfill orders with our end customers.

    Sounds like a “loaner system” will cause extra costs for us? If so, no, don’t want to go through.

    With that said what is the new ETA FOR THE NEW MACHINE?

    Please advise.

     

    Get Outlook for iOS


    From: Christopher Berger <cberger@turnpack.com>
    Sent: Tuesday, May 5, 2026 9:05:33 AM
    To: Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com>
    Cc: Info at Turnpack <info@turnpack.com>; LLC SO2524915 Turnpack <catchall@turnpack.com>; Castillo, Ricardo - MX <Ricardo.Castillo@am.spectrumcontrol.com>; Ortega, Estela - MX <estela.ortega@am.spectrumcontrol.com>; Sosa, Rosa - MX <Rosa.Sosa@am.spectrumcontrol.com>; Mata, Monica - MX <Monica.Mata@am.spectrumcontrol.com>; Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com>; Licon, Ana - MEX <Ana.Licon@am.spectrumcontrol.com>; Heredia, Roman - MX <Roman.Heredia@am.spectrumcontrol.com>
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Federico,

     

    I didn't realize you wanted a loaner system but we started on preparing that go get it shipped to you early next week. I will keep you posted on this.

     

    Regarding your machine we could not purchase more of the X-stage drive motors due to obsolescence even though the Sales Rep had originally indicated that we could make one last buy. We have been working to update the design and have placed orders for different motors that need integration. With the new design also includes a touchscreen and recipe management functionality which the current outdated version lacks. 

     

    Thanks

    Chris

     

    On Tue, May 5, 2026 at 5:26 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Any feedback?

     

    From: Rodarte, Federico - MEX
    Sent: Thursday, April 30, 2026 8:53 AM
    To: 'Christopher Berger'
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Team Turnpack, Christopher, Lorena, the extended six weeks delay due this week.

    Have not receive a “loaner system” since, yet would like to know what’s the ETA of our new machine is within next week having the extended six weeks already passed.

    Please advise today.

    Thanks

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Monday, March 23, 2026 11:12 AM
    To: Rodarte, Federico - MEX
    Cc: Info at Turnpack; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Federico,

     

    Please accept my sincere apologies for the delayed response and the ongoing frustration this has caused your team.

     

    We have received a further update regarding the supply chain issues for the Midas D5L6 De-Lidder (Ref SO2524915). Unfortunately, we are facing an additional six-week delay due to a custom component. Because this part is highly specialized, it cannot be sourced from an alternative vendor or replaced with a different component in a shorter timeframe.

     

    We understand that you desperately need this equipment to meet your own customer commitments. To help bridge this gap, I am currently putting together a loaner system that we hope to ship by the end of this week. This should allow you to maintain operations while we finalize your specific machine.

     

    I will provide a firm confirmation regarding the loaner shipment and a revised ETA for your unit as soon as possible. Thank you for your continued patience.

     

    Best regards,

     

    Chris Berger

     

    On Mon, Mar 23, 2026 at 10:04 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

     

    Team Turnpack, Christopher, Lorena, again and again looking for answers, at least a reply from someone in your Company that is taking care of business.

     

    No one replies, what is the issue?, when you are going to provide feedback on the machine, not the “waiting on new components” but on the updated ETA?

     

    Please advise or at least tell us who to contact if you’re not the right person to follow-up.

     

    Thanks

     

    From: Rodarte, Federico - MEX
    Sent: Wednesday, March 18, 2026 8:26 AM
    To: Info at Turnpack; Christopher Berger; LLC SO2524915 Turnpack
    Cc: Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hello, Christopher, Lorena.

    We have been dealing with our end- Customer the delays on the equipment availability.

     

    We do receive from you only status that you are waiting on components and promising status… but nothing comes after.

     

    So… what is the status?, when is the new committed ETA while 3/15 did not occur?

     

    Please advise.

     

    Thanks

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Thursday, March 12, 2026 12:20 PM
    To: Rodarte, Federico - MEX
    Cc: Christopher Berger; LLC SO2524915 Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hello Team!

     

    we are still waiting on delivery for a few more components. I am expecting to have more information by end of day tomorrow.  Your patience is appreciated. thank you. 

     

    On Wed, Mar 11, 2026 at 8:39 AM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hello, Christopher, Lorena.

     

    Any update?, 03/15 is this coming Sun/Mon 03/16…. Are we still on target?

     

    Thanks

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Wednesday, March 4, 2026 1:26 PM
    To: Rodarte, Federico - MEX
    Cc: LLC SO2524915 Turnpack; Info at Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Federico,

    Thank you for checking in.

    We are currently addressing a supply chain issue related to the cutter motor on the D5L6 De-Lidder. Normally we keep these motors in stock, however an unusually high volume of machine orders recently depleted our inventory.

    We are actively working with the supplier to secure the next delivery and determine the exact timing. At the moment we are still targeting the March 15th delivery date, but we are waiting on final confirmation from the supplier.

    I expect to have a firm update for you by this Friday and will send it as soon as I receive confirmation.

    Thank you for your patience while we work through this.

    Best regards,
    Chris Berger

     

    On Wed, Mar 4, 2026 at 12:33 PM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hi Christopher, trust me, before sending a message to you, I’ve checking first with Ms. Ivonne for status.

     

    No update from Feb 20th. yet.

     

    Since you had said that have some supply challenges we would like to know if March the 15th. still the ETA?

     

    Please advise…. Thanks

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Friday, February 20, 2026 6:47 PM
    To: Rodarte, Federico - MEX
    Cc: LLC SO2524915 Turnpack; Info at Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: Re: **3rd Email ** Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Federico, 

     

    Apologies for not sending a direct response to you but we have been updating Ivonne and I assumed you would be in touch with her. 

     

    We are working on supply chain challenges and will above if we encounter any delays.

     

    Chris

     

    Christopher Berger

    Phone: +1 (480) 331-1878

    Cell: +1 (480) 273-4686

    cberger@turnpack.com | www.turnpack.com

     

     

    On Fri, Feb 20, 2026, 4:31 PM Rodarte, Federico - MEX <Federico.Rodarte@am.spectrumcontrol.com> wrote:

    Hello Turnpack team, Christopher, 3rd E-mail sent asking for assistance with no answer , tried also by phone and no answer. Can someone from Turnpack replies?, or who to contact in case you’re not responsible for Customer Service?

    Thanks 

     

    Get Outlook for iOS


    From: Rodarte, Federico - MEX
    Sent: Monday, February 16, 2026 7:04:47 AM
    To: Christopher Berger <cberger@turnpack.com>; LLC SO2524915 Turnpack <catchall@turnpack.com>; Info at Turnpack <info@turnpack.com>
    Cc: Castillo, Ricardo - MX <Ricardo.Castillo@am.spectrumcontrol.com>; Ortega, Estela - MX <estela.ortega@am.spectrumcontrol.com>; Sosa, Rosa - MX <Rosa.Sosa@am.spectrumcontrol.com>; Mata, Monica - MX <Monica.Mata@am.spectrumcontrol.com>; Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com>; Licon, Ana - MEX <Ana.Licon@am.spectrumcontrol.com>; Heredia, Roman - MX <Roman.Heredia@am.spectrumcontrol.com>
    Subject: RE: Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

     

    Hellos Turnpack team, good morning.

     

    Sent you this E-mail Wednesday, have not receive a response, can you please check and advise at your earliest convenience?

     

    Thanks

     

    From: Rodarte, Federico - MEX
    Sent: Wednesday, February 11, 2026 3:38 PM
    To: Christopher Berger; LLC SO2524915 Turnpack; Info at Turnpack
    Cc: Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Mata, Monica - MX; Castillo, Ivonne - MX; Licon, Ana - MEX; Heredia, Roman - MX
    Subject: RE: Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hello Christopher, Turnpack team, can you please share an update of the ETA of the de-lidder?

     

    Desperately needed to have it as soon as possible.

     

    Thanks and appreciate your efforts to improve 03/15 targeted date if possible.

     

    Federico Rodarte R – Mexico Operations

    Spectrum Control, Inc

    +1 915 592 2249 Xt 106

    Federico.Rodarte@am.spectrumControl.com

     

     

     

     

    From: Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com>
    Sent: Friday, February 6, 2026 3:21 PM
    To: Christopher Berger; LLC SO2524915 Turnpack
    Cc: Info at Turnpack; Castillo, Ricardo - MX; Ortega, Estela - MX; Sosa, Rosa - MX; Rodarte, Federico - MEX; Mata, Monica - MX
    Subject: RE: Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    Hi Chris.

    The next week I’ll be on vacations so please help me to keep to all in copy for any update.

     

    Thank you and have a good weekend!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Thursday, February 5, 2026 9:23 AM
    To: Castillo, Ivonne - MX; LLC SO2524915 Turnpack
    Cc: Info at Turnpack; Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Rodarte, Federico - MEX; Mata, Monica - MX
    Subject: RE: Turnpack, LLC Quotation (Ref SO2524915) PO.MX32667

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Ivonne,

     

    I am on a business trip this week and a little behind. I will be in the office tomorrow and then send you an update.

     

    Chris

     

    Christopher Berger

    Phone: +1 (480) 331-1878

    Cell: +1 (480) 273-4686

    cberger@turnpack.com | www.turnpack.com

    Image removed by sender.

     

     

    On Thu, Jan 29, 2026 at 13:59 PM Ivonne - MX Castillo wrote:

    Hello Chris,

    Hope you’re doing well,

     

    Are we still good with target Ship Date: March 15, 2026 ?

     

    Please let us know.

     

    Thank you and have a good afternoon!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Friday, January 9, 2026 4:57 PM
    To: Castillo, Ivonne - MX
    Cc: Info at Turnpack; Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915; Mata, Monica - MX
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) install & training in Mexico?

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Ivonne,

    This email confirms receipt of your order for the Midas D5L6 Delidder. We have initiated the project and are proceeding with execution on our standard, proven platform based on prior builds.

    Below is the high-level project schedule for planning purposes. This build is largely procurement-, machining-, and assembly-driven, with limited engineering activity focused on BOM verification and minor drawing updates only.

    High-Level Project Schedule (Subject to Material Lead Times)

    • Requirements Confirmation & BOM Validation:
      Final confirmation of scope, verification and cleanup of the existing BOM, and release for purchasing.
    • Purchasing & Machining:
      Procurement of all purchased components and machining/fabrication of custom parts. Long-lead items will be tracked closely.
    • Build & Wiring:
      Mechanical assembly of the machine and control panel build and wiring.
    • Integration & Testing:
      Power-up, functional verification, and process testing.
    • Documentation, Crating & Delivery:
      Final documentation package, crating, and shipment preparation.

    Target Ship Date: March 15, 2026

    We will communicate proactively if any supplier lead times impact this date. Otherwise, execution will proceed to support shipment on the target date above.

    Please let us know if you have any questions or if additional coordination is needed.

    Best regards,
    Chris

     

    On Fri, Dec 19, 2025 at 4:56 PM Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com> wrote:

    Hello Chris,

    Thank you for your replied.

     

    Please find PO attached for this shipment.

     

    Hopefully, you can help us to improve lead time.

     

    Thank you and have a good afternoon.

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Friday, December 19, 2025 4:49 PM
    To: Castillo, Ivonne - MX
    Cc: Christopher Berger; Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915; Mata, Monica - MX
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) install & training in Mexico?

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hello Ivonne

     

    Thank you for the inquiry.  I do not see where a PO was sent for this to confirm the order. 

     

    Can you please forward to info@turnpack.com so we can get this moving for you?

     

    Once received we can send a update on the lead-time. 

     

    Have a great day! 

     

     

     

    On Fri, Dec 19, 2025, 1:32 PM Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com> wrote:

    Hello Chris,

    Hope you’re doing well,

    Would you help us to know about status of this SO2524915 delivery, please?

     

    Thank you!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Christopher Berger <cberger@turnpack.com>
    Sent: Tuesday, November 4, 2025 8:52 AM
    To: Castillo, Ivonne - MX
    Cc: Info at Turnpack; Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915; Ortega, Estela - MX; Mata, Monica - MX
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) install & training in Mexico?

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Ivonne,

     

    Yes, installation and training in Juarez Chihuahua, Mexico is provided with these line items. We will fly into El Paso and then probably need some advice from you on how to best cross the border and which hotel to stay in.

     

    Chris

     

    On Tue, Nov 4, 2025 at 8:07 AM Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com> wrote:

    Good day Chris,

    We are still waiting the response regarding if Install & Training is available here in Juarez Chihuahua, Mexico

     

    Please let us know if not is available. 

     

    If service isn’t available, please help us to remove “install & Training” from quote and let us know how guarantee will be affected if we do the installation by ourself.

     

     

    Thank you!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Castillo, Ivonne - MX
    Sent: Monday, November 3, 2025 7:51 AM
    To: Info at Turnpack
    Cc: Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915; Ortega, Estela - MX; Mata, Monica - MX
    Subject: RE: Turnpack, LLC Quotation (Ref SO2524915) help for update quote date.

     

    Good day Chris,

    Information received. Thank you!

     

    This location is our broker warehouse (we do all importation arrangements from there).

    SHIP TO ADDRESS:

    Spectrum Control, De Mexico

    C/O WTS Corporation Inc.

    9540 Joe Rodriguez

    El Paso, TX, 79927

     

    Our location is in Juarez, Chihuahua.  Mexico.  so, regarding Install & Training, are you available to do it here in Mexico?

     

     

     

     

    Please confirm.

    Thanks again & have a great week!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Saturday, November 1, 2025 9:20 AM
    To: Castillo, Ivonne - MX
    Cc: Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) help for update quote date.

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hello Ivonne, 

     

    Please see attached forms per your request.

     

    Sales/Engineering 

    Contact name: Chris Berger

    Address: 22425 S Scotland Ct 104

    Email: cberger@turnpack.com 

    Phone number: 480.331.1878

     

     

    Document Processing

    Contact name: Lorena Carrillo 

    Address: 22425 S Scotland Ct 104

    Email: info@turnpack.com 

    Phone number: 480.331.1878

    On Fri, Oct 31, 2025, 10:11 AM Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com> wrote:

    Hi Chris,

    Received, Thank you!

     

    Would you help us to provide information to do all arrangements for payment thru wire transfer, please?

     

    Also, we need some information for your Company for uploaded in our supplier system. Would you help us to provide it please?

     

    Contact name:

    Address:

    Email:

    Phone number:

    W9 form

    and filled out attached form.

     

    Thank you and Happy Halloween!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Friday, October 31, 2025 10:30 AM
    To: Castillo, Ivonne - MX
    Cc: Castillo, Ricardo - MX; Suarez, Juan - MEX; Sosa, Rosa - MX; Turnpack, LLC SO2524915
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) help for update quote date.

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Ivonne,

     

    Thanks for your email. I just resent the quote from our system. Please let us know if you have any questions.

     

    Chris

     

    On Thu, Oct 30, 2025 at 3:16 PM Castillo, Ivonne - MX <Ivonne.Castillo@am.spectrumcontrol.com> wrote:

    Hello Chris,

    Hope you’re doing well,

     

    We have the purchase for the de-lidder authorized but quotation attached date now is expired.

     

    Would you help us for update it please or can we use it anyway?

     

    Please let us know

    Thank you!

    Ivonne Castillo

    MRO Purchasing

    SPECTRUM CONTROL INC.

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, August 5, 2025 3:34 PM
    To: Castillo, Ricardo - MX
    Cc: Sosa, Rosa - MX; Castillo, Ivonne - MX; Turnpack, LLC SO2524915; Suarez, Juan - MEX
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) help for update quote date.

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    Hi Ricardo,

     

    Sorry about that. I kept looking for DSF6 and didn't see the mistake of D5F6. Attached is the updated quote.

     

    Chris

     

     

     

    On Tue, Aug 5, 2025 at 2:28 PM Castillo, Ricardo - MX <Ricardo.Castillo@am.spectrumcontrol.com> wrote:

    Hi Chris

     

    Cover page of quotation shows a D5F6, while the one we look for is a linear delidder not fiber one. We want a D5L6.

     

    There might be an issue while approving our internal CER if we show a different model on cover than the one that is on next pages.

     

     

     

     

    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, August 5, 2025 3:25 PM
    To: Sosa, Rosa - MX
    Cc: Castillo, Ivonne - MX; Turnpack, LLC SO2524915; Suarez, Juan - MEX; Castillo, Ricardo - MX
    Subject: Re: Turnpack, LLC Quotation (Ref SO2524915) help for update quote date.

     

    IMPORTANT: This email originated from outside of Spectrum Control. Do not click any links or open any attachments unless you know the content is safe.

     

    HI Rosa,

     

    I am not sure I follow. Where does it say DSF6?

     

    Chris

     

    On Tue, Aug 5, 2025 at 1:36 PM Sosa, Rosa - MX <Rosa.Sosa@am.spectrumcontrol.com> wrote:


    by Ricardo Castillo - 10:57 - 7 Oct 2026
  • Re: Your DATRON CNC Milling Tools order has been received!

    I sent a request for the address to be updated last night- please either copy me or let me do these steps moving forward to avoid double work or confusion for the vendor. 

    Thank you.

    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, October 6, 2026 9:27 PM
    To: Samantha Roman <sroman@turnpack.com>
    Cc: Christopher Berger <cberger@turnpack.com>
    Subject: Re: Your DATRON CNC Milling Tools order has been received!
     
    I updated the addresses and emailed them but of course you can too.  tools@datron.com

     
    No all the address should be updated to the new address.  Thanks for your help!

    Lorena Carrillo
    Office Manager

    Office: 480-331-1878
    Direct Line: 781-938-0069
    NEW ADDRESS: 6922 Via Northgate Ste 101, Mesa, AZ 85212

    lcarrillo@turnpack.com | www.turnpack.com
    https://www.turnpack.com/midas-rework/delidder

    On Tue, Oct 6, 2026, 8:39 PM Samantha Roman <sroman@turnpack.com> wrote:
    That's odd, I specifically typed out the address for this one to come here. I will send them a message asking for it to be updated. 

    I needed to get an estimated arrival date- so that helps. Do we leave the billing as QC for now? 


    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, October 6, 2026 8:33 PM
    To: Christopher Berger <cberger@turnpack.com>; Samantha Roman <sroman@turnpack.com>
    Subject: Fwd: Your DATRON CNC Milling Tools order has been received!
     
    This order shipped to queen creek 

    Lorena Carrillo
    Office Manager

    Office: 480-331-1878
    Direct Line: 781-938-0069
    NEW ADDRESS: 6922 Via Northgate Ste 101, Mesa, AZ 85212

    lcarrillo@turnpack.com | www.turnpack.com
    https://www.turnpack.com/midas-rework/delidder

    ---------- Forwarded message ---------
    From: DATRON USA <orders@datron.com>
    Date: Tue, Oct 6, 2026, 12:18 PM
    Subject: Your DATRON CNC Milling Tools order has been received!
    To: <info@turnpack.com>


    DATRON CNC Milling Tools

    Thank you for your order

    Hi Christopher,

    Just to let you know — we’ve received your order, and it is now being processed.

    Here’s a reminder of what you’ve ordered:

    Order summary
    Order #26703 (October 6, 2026)

    Product Quantity Price
    Tool Adapter

    Tool Adapter
    SKU: 0068336

    Cutting Diameter (D1): 3mm
    Shank (D2): 6mm
    D3: 7.55mm
    ×3 $353.94
    SIngle-Flute-End-Mill---Long-Reach

    Long Reach Single Flute End Mill
    SKU: 00684910

    Cutting Diameter (D1): 1mm
    Shank (D2): 6mm
    D3: 0.9mm
    Length (L1): 50mm
    Cutting Depth (L2): 4mm
    L3: 7mm
    Flutes: 1
    ×2 $138.12

    Subtotal: $492.06
    Shipping: Free Ground Shipping Free!
    Tariff Surcharge: $39.36
    Tax: $0.00
    Total: $531.42
    Payment method: Credit Card

    Customer note
    PO 26402209

    Billing address
    Christopher Berger
    Turnpack
    22425 S Scotland Ct
    Suite 104
    Queen Creek, AZ 85140
    4803311878
    info@turnpack.com
    Shipping address
    Christopher Berger
    Turnpack
    22425 S Scotland Ct
    Suite 104
    Queen Creek, AZ 85140
    4803311878

    Thanks for using shop.datron.com!
    *Please note that items shipped from separate warehouses may arrive in multiple packages.


    by Samantha Roman - 10:57 - 7 Oct 2026
  • UPDATE: Shipment for Order W026703 was changed


    Ship to:
    Turnpack
    6922 E Via Northgate, Suite 101
    Mesa, AZ 852121295
    UNITED STATES
    (480) 331-1878


    Your shipment for order(s) W026703 has been modified. Please disregard the previous notification and refer to the following information regarding the new shipment.

    It was processed on 10/07/2026 using USPS (USPS Priority Mail®) service. The physical package(s) may or may not have actually been tendered to USPS for the shipment.

    The new shipment contains 1 packages with master tracking number 9405536105441276070946, estimated delivery is 10/09/2026.

    Pkg #

    Tracking Number

    1

    9405536105441276070946

    Item #

    Description

    Qty Ordered

    Qty Shipped

    0068336 6mm Adapter for 3mm Tool

    3

    3

    00684910 1mm SF EM x 6mm

    2

    2

    /TARIFF Tariff Surcharge

    1

    1



    We appreciate your business,
    DATRON USA Inc
    115 Emerson Rd
    Milford, NH 030553583
    UNITED STATES
    (603) 215-5849

    Shipping and email automation powered by StarShip

    by eNotify@starship.online - 10:41 - 7 Oct 2026
  • Ship Notification: Shipment for Order W026703 was processed


    Ship to:
    Turnpack
    6922 E Via Northgate, Suite 101
    Mesa, AZ 852121295
    UNITED STATES
    (480) 331-1878


    DATRON USA Inc is pleased to inform you that the shipment for your order(s) W026703 has been processed using USPS (USPS Priority Mail®) service. The physical package(s) may or may not have actually been tendered to USPS for the shipment.

    Your shipment contains 1 packages with master tracking number 9405536105441276070939, estimated delivery is 10/09/2026.

    Pkg #

    Tracking Number

    1

    9405536105441276070939

    Item #

    Description

    Qty Ordered

    Qty Shipped

    0068336 6mm Adapter for 3mm Tool

    3

    3

    00684910 1mm SF EM x 6mm

    2

    2

    /TARIFF Tariff Surcharge

    1

    1



    We appreciate your business,
    DATRON USA Inc
    115 Emerson Rd
    Milford, NH 030553583
    UNITED STATES
    (603) 215-5849

    Shipping and email automation powered by StarShip

    by eNotify@starship.online - 10:38 - 7 Oct 2026
  • RE: Order #26703 (October 6, 2026)

    This has been updated in our system, thank you!

     

     

    DATRON USA
    Datron Tooling
    tools@datron.com
    www.datron.com
     
     
    DATRON USA will be closed Monday, October 12.. Normal business hours will resume Tuesday, October 13.​​​​

    From: Samantha Roman <sroman@turnpack.com>
    Sent: Tuesday, October 6, 2026 11:43 PM
    To: Datron Tooling <tools@datron.com>
    Subject: Order #26703 (October 6, 2026)

     

    Hello,  I need to update the shipping address on our account and have this order sent to the correct one. Please advise if this is possible.  New address is 6922 East Via Northgate Mesa AZ 85212  Thank you, Samantha Roman Operations &am

    Hello, 

     

    I need to update the shipping address on our account and have this order sent to the correct one. Please advise if this is possible. 

     

    New address is 6922 East Via Northgate Mesa AZ 85212 

     

    Thank you,

     

    Samantha Roman

    Operations & Program Manager

    Turnpack, LLC

    sroman@turnpack.com

    +1 480-331-1878

     


    by Casey Howrilka - 09:41 - 7 Oct 2026
  • ALA Scheduled Maintenance

    Email from Allyn International Services, Inc.

    Logistics Management | Tax Services | Global Trade Compliance

    October 2026

    ALA Scheduled Maintenance

    We would like to inform you of an upcoming ALA scheduled maintenance. Please take note of the following details:


    Date: Wednesday, October 7

    Time: 12:00 p.m. – 12:15 p.m. ET

    Duration: 15 Minutes

     

    Maintenance Details:


    This maintenance will include a security upgrade to the ALA FTP server. As part of this upgrade, clients utilizing the FTP server will be prompted to accept a new security certificate upon their next connection. 

    

    We appreciate your understanding and cooperation as we strive to improve our services.

    If you have any further questions or concerns, please reach out to our ALA Helpdesk.
     
    Facebook  Twitter  Linkedin  Youtube  

    Allyn International Services, Inc. | 13391 McGregor Blvd. | Fort Myers, FL 33919 US

    Unsubscribe | Update Profile | Constant Contact Data Notice

    Constant Contact

    by "Allyn IT Team" <allynnoreply@allynintl.com> - 09:01 - 7 Oct 2026
  • *Turnpack - Lockheed PO 117242 LR 154657 Angel R. Task 12546448

    Lockheed Martin Proprietary Information


    Good morning,

    Please see attached order and confirm receipt thank you  ✔

    >NOTE ON QUOTES – PLEASE REFER TO MY PO ORDER attached FOR EXACT QTY and SHIPPING ADDRESS ✔

    • PAYMENT - Please use cc ending in 5934 or send payment link or let me know if I need to call.  

    *If there is a price revision please proceed with the order unless there is a very large difference – then we will confirm the new price and or get you a revised PO.     

    • WE PREFER 😊 that you pre-pay and bill shipping
    • BELOW IS OUR ACCOUNT FOR UPS or FedEx if you can’t pre-pay and bill shipping

    • When available please send itemized invoice for our reconciling purposes.

     

    THANK YOU 😊

    We are not tax exempt

    We cannot accept shipments direct from outside the USA.

    Melanie Baker

    Purchasing Administrative Assistant

    Missiles and Fire Control (MFC) 

    SHIPPING ADDRESS

    Lockheed Martin Facilities Maintenance 

    8801 Lockheed Martin Blvd

    Gate 4, M011

    Orlando, FL 32819

    Office: (407) 356-0173

    Cell-Text is ok: (407) 719-3651

    melanie.r.baker@lmco.com

    www.lockheedmartin.com/

     

    www.facebook.com/lockheedmartin

    x.com/lockheedmartin    

    www.youtube.com/user/LockheedMartinVideos

    www.linkedin.com/company/lockheed-martin

    www.instagram.com/lockheedmartin

     

     

     

    Lockheed Martin Proprietary Information


    Lockheed Martin Proprietary Information


    by "melanie.r.baker@lmco.com" <melanie.r.baker@lmco.com> - 07:06 - 7 Oct 2026
  • [Preview] Report Domain: turnpack.com Submitter: enterprise.protection.outlook.com Report-ID: 5a775147579f4764a067a1b072e60ddb
    This is a DMARC aggregate report from Microsoft Corporation. For Emails received between 2026-10-05 00:00:00 UTC to 2026-10-06 00:00:00 UTC. div>

    You're receiving this email because you have included your email address in the 'rua' tag of your DMARC record in DNS for turnpack.com. Please remove your email address from the 'rua' tag if you don't want to receive this email.

    Please do not respond to this e-mail. This mailbox is not monitored and you will not receive a response. For any feedback/suggestions, kindly mail to dmarcreportfeedback@microsoft.com.

    Microsoft respects your privacy. Review our Online Services Privacy Statement.
    One Microsoft Way, Redmond, WA, USA 98052. div >

    by "DMARC Aggregate Report" <dmarcreport@microsoft.com> - 05:02 - 7 Oct 2026
  • FedEx Billing Online - Invoice Ready for Payment

    You have a FedEx invoice ready for payment. Pay now.
    FedEx
    FedEx
    Your invoice is ready for payment
    Dear christopher berger,
    Your account ending in 6805 has a new invoice(s) from FedEx ready for payment.
    Invoice number:Invoice amount:
    9-493-13853107.92
    Log in to FedEx® Billing Online to review and pay your invoices.
    Log In
    Thank you for your business,
    FedEx
    Note: Please do not use this email to submit payment. This email may not be used as a remittance notice. To pay your invoices, please visit FedEx Billing Online.


    ©2026 FedEx.The content of this message is protected by copyright and trademark laws under U.S. and international law.

     

    Review our privacy policy. All rights reserved.

    This message has been sent by an auto responder system. Please do not reply to this message.
    ID ENS- 2356


    by "BillingOnline" <BillingOnline@fedex.com> - 03:53 - 7 Oct 2026
  • A shipment from order us784089579639574529 is on the way
    us784089579639574529

    Your order is on the way
    Your order is on the way. Track your shipment to see the delivery status.
    UPS tracking number: 1Z4E2W090319045580
    Items in this shipment
    Bambu Lab H2S × 1

    H2S AMS Combo

    Need help with your order?
    Please check out our FAQ or contact us at Customer Support.

    How to get your invoice?
    You will be able to download the invoice from your Account Center after your order is completed.

    Hit the "Place Order" button before you were ready?
    You can cancel your order within 2 hours from the time you click 'Place Order' — Proceed to your account center to cancel. For complete details, refer to Order cancellation

    For further details regarding your purchase, please read our Shipping policy , Returns & Refunds policy.

    Please visit us again soon at bambulab.com. Bambulab USA Inc. | 8000 Centre Park Drive STE 330, Austin, TX 78754




    by "Bambu Lab" <noreply@notify.bambulab.com> - 03:38 - 7 Oct 2026
  • Invoice for Your Order PO26402208
    McMaster-Carr
    562-692-5911
    562-695-2323 (fax)
    la.sales@mcmaster.com
    Invoice
    Billed to
    TURNPACK LLC
    6922 E VIA NORTHGATE STE 101
    MESA AZ 85212
    Purchase OrderPO26402208
    Total $305.23
    Invoice73149999
    Invoice Date10/6/26
    Payment Terms2% 10, Net 30
    Deduct $5.50 on merchandise if paid by 10/16/26.
    Shipped to
    Turnpack LLC
    6922 E Via Northgate Ste 101
    Mesa AZ 85212
    Mail Payment toMcMaster-Carr
    PO Box 7690
    Chicago IL 60680-7690
    Your Account 438808000
    Christopher Berger placed this order.

    LineProductOrderedShippedBalancePriceTotal
    19262K519Oil-Resistant Buna-N O-Ring, 1.5 mm Wide, 5.5 mm ID, Packs of 100 2
    Packs
    2 0 7.69
    Per Pack
    15.38
    292125A05218-8 Stainless Steel Hex-Drive Flat Head Screw, M2 x 0.4 mm Thread Size, 6 mm Long, Packs of 50 7
    Packs
    7 0 12.00
    Per Pack
    84.00
    389155K234Oversized Multipurpose 6061 Aluminum Sheet, 2-1/4" Thick, 6" x 12" 1
    Each
    1 0 175.63
    Each
    175.63
    Merchandise275.01
    Shipping30.22
    Total$305.23

    Packing ListShippedWeightCarrierTracking
    6689947-0210/06/20261 lbUPS1Z0526850314417126
    6689947-0110/06/202618 lbUPS1Z1800200194813885
    Federal ID 36-1458720

    by "McMaster-Carr" <invoice.reply@mcmaster.com> - 02:51 - 7 Oct 2026
  • Invoice for Your Order PO 26402215
    McMaster-Carr
    562-692-5911
    562-695-2323 (fax)
    la.sales@mcmaster.com
    Invoice
    Billed to
    TURNPACK LLC
    6922 E VIA NORTHGATE STE 101
    MESA AZ 85212
    Purchase OrderPO 26402215
    Total $56.84
    Invoice73148952
    Invoice Date10/6/26
    Payment Terms2% 10, Net 30
    Deduct $0.89 on merchandise if paid by 10/16/26.
    Shipped to
    Turnpack LLC
    6922 E Via Northgate Ste 101
    Mesa AZ 85212
    Mail Payment toMcMaster-Carr
    PO Box 7690
    Chicago IL 60680-7690
    Your Account 438808000
    Christopher Berger placed this order.

    LineProductOrderedShippedBalancePriceTotal
    197654A38318-8 Stainless Steel Flanged Button Head Hex-Drive Screw, M8 x 1.25 mm Thread, 16 mm Long, Packs of 10 3
    Packs
    3 0 14.77
    Per Pack
    44.31
    Merchandise44.31
    Shipping12.53
    Total$56.84

    Packing ListShippedWeightCarrierTracking
    6740913-0110/06/20262 lbUPS1Z9293810107183293
    Federal ID 36-1458720

    by "McMaster-Carr" <invoice.reply@mcmaster.com> - 02:47 - 7 Oct 2026
  • Thanks for your recent purchase

    Thanks for your recent purchase

    Micro Center logo

    Hi Chris B,
     
    Thank you for choosing to shop with us! We'd love to hear your thoughts about your 64GB 2X32 6000 34 B EX while it's still fresh on your mind. Simply click the stars to start your product review:
     
    Your product reviews mean a lot to us! We proudly partner with Bazaar Voice to ensure honest and valuable feedback online.
     
    Thank you for helping us improve and for being a valued customer. We look forward to assisting you again soon!

    64GB 2X32 6000 34 B EX
    64GB 2X32 6000 34 B EX
    Select a rating below (Select 5 stars = Excellent, 1 star = Poor) *
    Can't enter text? Click here to start rating.
    Quality insights are 2-3 sentences long.
    If you are unable to submit, copy your review and paste it into this form.

    Rate your other purchases

    AMD RYZEN 9 9950X WO COOL

    2TB 990PRO NVME GEN4 SSD

    Micro Center logo
    Contact Customer Service with questions or concerns. If you no longer wish to receive notifications like this, you can unsubscribe any time.
     
    This email was sent by: Micro Center
    4119 Leap Road, Hilliard, Ohio, 43026, USA
     


    by "Micro Center" <noreply-microcenter@bazaarvoice-cgc.com> - 02:47 - 7 Oct 2026
  • Re: Order Acknowledgement - PO # WEB ORDER 10/06/26
    yeah I already froze it

    On Tue, Oct 6, 2026 at 9:34 PM Info at Turnpack <info@turnpack.com> wrote:
    Can we place a hold on the card so it cant accidentally be used?  I know we were looking at cancelling but idk if you got that far yet?  
    Just a thought 


    On Tue, Oct 6, 2026, 9:17 PM Christopher Berger <cberger@turnpack.com> wrote:
    Great. Thank you

    On Tue, Oct 6, 2026 at 9:15 PM Info at Turnpack <info@turnpack.com> wrote:
    Removed 

    I also updated the login sheet and made a Turnpack Vendors tab. Removing all Birch accounts. 


    On Tue, Oct 6, 2026, 8:40 PM Christopher Berger <cberger@turnpack.com> wrote:
    Thanks. I cancelled the PO and reconfirmed it under Birch. Probably need to remove the Birch card from web stores when we get a chance.

    On Tue, Oct 6, 2026 at 8:33 PM Info at Turnpack <info@turnpack.com> wrote:
    This order was placed on the birch account not turnpack. 




    ---------- Forwarded message ---------
    From: MSCIndustrialSupply@MSCDIRECT.COM <MSCIndustrialSupply@mscdirect.com>
    Date: Tue, Oct 6, 2026, 12:26 PM
    Subject: Order Acknowledgement - PO # WEB ORDER 10/06/26
    To: info@birchmfg.com <info@birchmfg.com>


    logo Order Acknowledgement
    Thank you for your order!
     
    This is an automated confirmation response to your purchase with MSC Industrial Supply. If you require a change to this order, please contact our customer service department at (800) 645-7270 as your order is in process and we have a limited time window for modifications. 

    Once your order is processed, we will send you a separate shipping acknowledgement email.

    In addition, you can always check the status of your order by clicking here to log into your MSC Account:
    log in and check order status


    Summary for Order number 261155046
    Order Date/Method: 10/06/2026    Web Order #: 181433790
    Purchase Order#: WEB ORDER 10/06/26
    Contact: CHRISTOPHER BERGER
    Attn:
    Account #: 9371670
    Payment Method: AMEX 1007





      Bill To:
      BIRCH MANUFACTURING AZ
      22425 S SCOTLAND CT
      STE 104
      QUEEN CREEK, AZ 85142
      Ship To:
      TURNPACK
      6922 E VIA NORTHGATE
      STE 1
      MESA, AZ 85212

    Packing Slip 8570141 &nbsp( 1 line )
    Est.Ship Date: &nbsp Tuesday, October 06, 2026
    Shipping Method/From:&nbsp UPS NXTDAY SAV UPGRADE AIR / RENO
    Est.Time in Transit: &nbsp  1 Business Days
    Est.Delivery Date: &nbsp  Wednesday, October 07, 2026
    Item # Total Qty. Ordered Qty. to be Shipped Back Ordered Vendor Drop Shipped Price  Ext. Price   Comments
    77429298     2 2 - - 33.0300 $66.06  
      M16X1.5 4FL D6 HERTEL HSS HAND PLUG TAP
    *Tax and shipping not included. See invoice for details.
    Subtotal: $66.06  

    Order Total: $66.06  
    This purchase is governed exclusively by MSC's Terms and Conditions that can be found in MSC's current catalog and at http://www.mscdirect.com. MSC's acceptance of your order is predicated on your assent to MSC 's Terms and Conditions, unless you have entered into a separate product purchase agreement with MSC that continues to be in effect on the date of your order. Such agreement, depending upon its terms, may supersede MSC's Terms and Conditions.


    --


    --


    --

    by Chris Berger - 12:42 - 7 Oct 2026
  • Re: Order Acknowledgement - PO # WEB ORDER 10/06/26
    Thanks. I cancelled the PO and reconfirmed it under Birch. Probably need to remove the Birch card from web stores when we get a chance.

    On Tue, Oct 6, 2026 at 8:33 PM Info at Turnpack <info@turnpack.com> wrote:
    This order was placed on the birch account not turnpack. 




    ---------- Forwarded message ---------
    From: MSCIndustrialSupply@MSCDIRECT.COM <MSCIndustrialSupply@mscdirect.com>
    Date: Tue, Oct 6, 2026, 12:26 PM
    Subject: Order Acknowledgement - PO # WEB ORDER 10/06/26
    To: info@birchmfg.com <info@birchmfg.com>


    logo Order Acknowledgement
    Thank you for your order!
     
    This is an automated confirmation response to your purchase with MSC Industrial Supply. If you require a change to this order, please contact our customer service department at (800) 645-7270 as your order is in process and we have a limited time window for modifications. 

    Once your order is processed, we will send you a separate shipping acknowledgement email.

    In addition, you can always check the status of your order by clicking here to log into your MSC Account:
    log in and check order status


    Summary for Order number 261155046
    Order Date/Method: 10/06/2026    Web Order #: 181433790
    Purchase Order#: WEB ORDER 10/06/26
    Contact: CHRISTOPHER BERGER
    Attn:
    Account #: 9371670
    Payment Method: AMEX 1007





      Bill To:
      BIRCH MANUFACTURING AZ
      22425 S SCOTLAND CT
      STE 104
      QUEEN CREEK, AZ 85142
      Ship To:
      TURNPACK
      6922 E VIA NORTHGATE
      STE 1
      MESA, AZ 85212

    Packing Slip 8570141 &nbsp( 1 line )
    Est.Ship Date: &nbsp Tuesday, October 06, 2026
    Shipping Method/From:&nbsp UPS NXTDAY SAV UPGRADE AIR / RENO
    Est.Time in Transit: &nbsp  1 Business Days
    Est.Delivery Date: &nbsp  Wednesday, October 07, 2026
    Item # Total Qty. Ordered Qty. to be Shipped Back Ordered Vendor Drop Shipped Price  Ext. Price   Comments
    77429298     2 2 - - 33.0300 $66.06  
      M16X1.5 4FL D6 HERTEL HSS HAND PLUG TAP
    *Tax and shipping not included. See invoice for details.
    Subtotal: $66.06  

    Order Total: $66.06  
    This purchase is governed exclusively by MSC's Terms and Conditions that can be found in MSC's current catalog and at http://www.mscdirect.com. MSC's acceptance of your order is predicated on your assent to MSC 's Terms and Conditions, unless you have entered into a separate product purchase agreement with MSC that continues to be in effect on the date of your order. Such agreement, depending upon its terms, may supersede MSC's Terms and Conditions.


    --
    Christopher Berger
    Phone: +1 (480) 331-1878
    Cell: +1 (480) 273-4686



    by Chris Berger - 11:42 - 6 Oct 2026
  • Re: Your DATRON CNC Milling Tools order has been received!

    That's odd, I specifically typed out the address for this one to come here. I will send them a message asking for it to be updated. 

    I needed to get an estimated arrival date- so that helps. Do we leave the billing as QC for now? 


    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, October 6, 2026 8:33 PM
    To: Christopher Berger <cberger@turnpack.com>; Samantha Roman <sroman@turnpack.com>
    Subject: Fwd: Your DATRON CNC Milling Tools order has been received!
     
    This order shipped to queen creek 

    Lorena Carrillo
    Office Manager

    Office: 480-331-1878
    Direct Line: 781-938-0069
    NEW ADDRESS: 6922 Via Northgate Ste 101, Mesa, AZ 85212

    lcarrillo@turnpack.com | www.turnpack.com
    https://www.turnpack.com/midas-rework/delidder

    ---------- Forwarded message ---------
    From: DATRON USA <orders@datron.com>
    Date: Tue, Oct 6, 2026, 12:18 PM
    Subject: Your DATRON CNC Milling Tools order has been received!
    To: <info@turnpack.com>


    DATRON CNC Milling Tools

    Thank you for your order

    Hi Christopher,

    Just to let you know — we’ve received your order, and it is now being processed.

    Here’s a reminder of what you’ve ordered:

    Order summary
    Order #26703 (October 6, 2026)

    Product Quantity Price
    Tool Adapter

    Tool Adapter
    SKU: 0068336

    Cutting Diameter (D1): 3mm
    Shank (D2): 6mm
    D3: 7.55mm
    ×3 $353.94
    SIngle-Flute-End-Mill---Long-Reach

    Long Reach Single Flute End Mill
    SKU: 00684910

    Cutting Diameter (D1): 1mm
    Shank (D2): 6mm
    D3: 0.9mm
    Length (L1): 50mm
    Cutting Depth (L2): 4mm
    L3: 7mm
    Flutes: 1
    ×2 $138.12

    Subtotal: $492.06
    Shipping: Free Ground Shipping Free!
    Tariff Surcharge: $39.36
    Tax: $0.00
    Total: $531.42
    Payment method: Credit Card

    Customer note
    PO 26402209

    Billing address
    Christopher Berger
    Turnpack
    22425 S Scotland Ct
    Suite 104
    Queen Creek, AZ 85140
    4803311878
    info@turnpack.com
    Shipping address
    Christopher Berger
    Turnpack
    22425 S Scotland Ct
    Suite 104
    Queen Creek, AZ 85140
    4803311878

    Thanks for using shop.datron.com!
    *Please note that items shipped from separate warehouses may arrive in multiple packages.


    by Samantha Roman - 11:42 - 6 Oct 2026
  • Your Purchase Order PO26402214 is confirmed.
    Xometry
    Your order is confirmed.
    We received your purchase order for 4 parts to be shipped to the address below. This order may ship in multiple packages.
    Order Status: Ordered
    Earliest Estimated Ship Date: Monday, Oct. 26, 2026
    Shipping Info
    Turnpack LLC
    6922 E Via Northgate
    Ste 101
    Mesa, AZ 85212
    United States
    4803311878
    info@turnpack.com
    Billing Info
    Accounts Payable
    22425 S Scotland Ct
    Suite 104
    Queen Creek, AZ 85142
    United States
    4803311878
    ap@turnpack.com

    Purchase Order Details
    Purchase Order Number: PO26402214
    Xometry Order Number: 4166D-15012
    (Displaying 4 of 4)
    Part thumbnail
    Estimated Ship DateMonday, Oct. 26, 2026
    MaterialAluminum 6061-T6x (Best Available)
    FinishStandard
    Quantity7
    $606.97
    Part thumbnail
    Estimated Ship DateMonday, Oct. 26, 2026
    MaterialAluminum 6061-T6x (Best Available)
    FinishStandard
    Quantity25
    $938.25
    Part thumbnail
    Estimated Ship DateMonday, Oct. 26, 2026
    MaterialAluminum 6061-T6x (Best Available)
    FinishStandard
    Quantity7
    $571.27
    Part thumbnail
    Estimated Ship DateMonday, Oct. 26, 2026
    MaterialStainless Steel 303
    FinishStandard
    Quantity105
    $825.30
    Subtotal:$2,941.79
    Shipping: Free Shipping
    Tax:$0.00
    Total:$2,941.79
    Need help? Chat with our support team for instant assistance.
    Log into your dashboard to view all your orders and shipments.
    All orders are subject to the terms of Xometry's Customer Service Agreement. If you have any questions or concerns about your order, contact us.
    Xometry

    ISO 9001:2015, ISO 13485:2016, IATF 16949:2016, AS9100D, and CMMC Level 2 Certified | ITAR-registered

    by "Xometry" <no-reply@xometry.com> - 11:37 - 6 Oct 2026
  • Re: Order Acknowledgement - PO # WEB ORDER 10/06/26

    Oops, sorry I grabbed the first login I saw on the sheet. I made sure it was coming to the right address. 

    Sorry about that! 


    From: Info at Turnpack <info@turnpack.com>
    Sent: Tuesday, October 6, 2026 8:33 PM
    To: Christopher Berger <cberger@turnpack.com>; Samantha Roman <sroman@turnpack.com>
    Subject: Fwd: Order Acknowledgement - PO # WEB ORDER 10/06/26
     
    This order was placed on the birch account not turnpack. 



    Lorena Carrillo
    Office Manager

    Office: 480-331-1878
    Direct Line: 781-938-0069
    NEW ADDRESS: 6922 Via Northgate Ste 101, Mesa, AZ 85212

    lcarrillo@turnpack.com | www.turnpack.com
    https://www.turnpack.com/midas-rework/delidder

    ---------- Forwarded message ---------
    From: MSCIndustrialSupply@MSCDIRECT.COM <MSCIndustrialSupply@mscdirect.com>
    Date: Tue, Oct 6, 2026, 12:26 PM
    Subject: Order Acknowledgement - PO # WEB ORDER 10/06/26
    To: info@birchmfg.com <info@birchmfg.com>


    logo Order Acknowledgement
    Thank you for your order!
     
    This is an automated confirmation response to your purchase with MSC Industrial Supply. If you require a change to this order, please contact our customer service department at (800) 645-7270 as your order is in process and we have a limited time window for modifications. 

    Once your order is processed, we will send you a separate shipping acknowledgement email.

    In addition, you can always check the status of your order by clicking here to log into your MSC Account:
    log in and check order status


    Summary for Order number 261155046
    Order Date/Method: 10/06/2026    Web Order #: 181433790
    Purchase Order#: WEB ORDER 10/06/26
    Contact: CHRISTOPHER BERGER
    Attn:
    Account #: 9371670
    Payment Method: AMEX 1007





      Bill To:
      BIRCH MANUFACTURING AZ
      22425 S SCOTLAND CT
      STE 104
      QUEEN CREEK, AZ 85142
      Ship To:
      TURNPACK
      6922 E VIA NORTHGATE
      STE 1
      MESA, AZ 85212

    Packing Slip 8570141 &nbsp( 1 line )
    Est.Ship Date: &nbsp Tuesday, October 06, 2026
    Shipping Method/From:&nbsp UPS NXTDAY SAV UPGRADE AIR / RENO
    Est.Time in Transit: &nbsp  1 Business Days
    Est.Delivery Date: &nbsp  Wednesday, October 07, 2026
    Item # Total Qty. Ordered Qty. to be Shipped Back Ordered Vendor Drop Shipped Price  Ext. Price   Comments
    77429298     2 2 - - 33.0300 $66.06  
      M16X1.5 4FL D6 HERTEL HSS HAND PLUG TAP
    *Tax and shipping not included. See invoice for details.
    Subtotal: $66.06  

    Order Total: $66.06  
    This purchase is governed exclusively by MSC's Terms and Conditions that can be found in MSC's current catalog and at http://www.mscdirect.com. MSC's acceptance of your order is predicated on your assent to MSC 's Terms and Conditions, unless you have entered into a separate product purchase agreement with MSC that continues to be in effect on the date of your order. Such agreement, depending upon its terms, may supersede MSC's Terms and Conditions.

    by Samantha Roman - 11:37 - 6 Oct 2026
  • Certificate and Tracking for Your Order PO 26402215
    We shipped the rounded head screws on order PO 26402215. You will receive them tomorrow. Track your shipment using UPS 1Z9293810107183293.

    The certificate for the rounded head screws is attached.

    by "McMaster - Carr" <la.sales@mcmaster.com> - 07:42 - 6 Oct 2026
  • Second Chance Picks + Trending Items for You, Friend

    🧠 We Picked These Just for You Friend
    Fresh picks based on your past bids and browsing.
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
      ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌   ‌  
    Jump back in there → Log In to My Account
    NA
    Auction   My Account   Help Desk
    Nellis Auction | Explore All
    Shop Deals by Price
    Easy Local Pickup Easy Local Pickup Easy Local Pickup
    Easy pickup
    7 Days returns
    Today's Trending Items
    Save 48%
    Apple iPhone 15 Pro 256GB Black Titanium - Unlocked
    $361 $695.02
    Apple iPhone 15 Pro 256GB Black Titanium - Unlocked
    Mesa
    Auction closes: Oct 6, 9:29p.m.
    View This Item
    Save 73%
    Binplax Party Tent 20x30 Canopy Heavy Duty, Waterproof Outdoor Event Tent with Removable Sidewalls & Roll-Up Door, Portable Carport for Wedding, BBQ, Camping, Birthday Party
    $151 $567.16
    Binplax Party Tent 20x30 Canopy Heavy Duty, Waterproof Outdoor Event Tent with Removable Sidewalls & Roll-Up Door, Portable Carport for Wedding, BBQ, Camping, Birthday Party
    Phoenix
    Auction closes: Oct 6, 9:02p.m.
    View This Item
    Save 69%
    LG 65-Inch QNED73B Mini LED 4K Smart TV
    $157 $507.4
    LG 65-Inch QNED73B Mini LED 4K Smart TV
    Phoenix
    Auction closes: Oct 6, 11:58p.m.
    View This Item
    Save 40%
    Ninja R-ES601 Luxe Café Premier Series Espresso Machine, Drip Coffee, Cold Brew, Grinder, Tamper, Frother, Silver (Renewed)
    $251 $418.79
    Ninja R-ES601 Luxe Café Premier Series Espresso Machine, Drip Coffee, Cold Brew, Grinder, Tamper, Frother, Silver (Renewed)
    Mesa
    Auction closes: Oct 6, 11:25p.m.
    View This Item
    Save 80%
    Hiboy S2 MAX Electric Scooter
    $101 $495.61
    Hiboy S2 MAX Electric Scooter
    Mesa
    Auction closes: Oct 7, 12:49a.m.
    View This Item
    Save 67%
    Shark BreatheClear Smart Air Purifier, HP162BK, Charcoal
    $106 $317.93
    Shark BreatheClear Smart Air Purifier, HP162BK, Charcoal
    Phoenix
    Auction closes: Oct 6, 9:07p.m.
    View This Item
    Save 71%
    Christopher Knight Home Hazel Oval Dining Table
    $201 $686.98
    Christopher Knight Home Hazel Oval Dining Table
    Mesa
    Auction closes: Oct 7, 12:08a.m.
    View This Item
    Save 45%
    LEGO Disney Princess Beauty and The Beast Castle Building Set - Room Decor for Women & Men, Ages 18+ - Model Building Kit for Adults - Book Shelf Display - Gift for Disney Fans - 43263
    $153 $279.99
    LEGO Disney Princess Beauty and The Beast Castle Building Set - Room Decor for Women & Men, Ages 18+ - Model Building Kit for Adults - Book Shelf Display - Gift for Disney Fans - 43263
    Mesa
    Auction closes: Oct 6, 10:40p.m.
    View This Item
    Save 81%
    Canyon Pathlite:ON 7 step-through, Outback Orange, Large
    $456 $2407.15
    Canyon Pathlite:ON 7 step-through, Outback Orange, Large
    Mesa
    Auction closes: Oct 6, 10:44p.m.
    View This Item
    Jump in the auction
    ITEMS WON
    0
    SAVINGS VS RETAIL
    $
    AVERAGE % OFF
    0%
    Nellis Auction
    Nellis Auction
    No-Hassle Returns:
    If it’s not right, return it within 7 days for a full refund.
    No penalties, no stress.
    Need help? Visit our Help Desk anytime.
    fb insta in yt
    Auction   My Account   Help Desk
    Watn to change how you receive these emails?
    You can Update Your Preferences or Unsubscribe
    © Copyright 2025 nellisauction.com. All Rights Reserved.

    by "Nellis Auction" <nelli@nellisauction.com> - 07:37 - 6 Oct 2026