- Mailing Lists
- Info Inbox
- Re: Design tooling nests for Config 1
Archives
Info Inbox
info@turnpack.com
Re: Design tooling nests for Config 1
I believe we can close this. There is no more design work for Config 1, unless the need for modifications arise. Nathan should finish machining the side gantry plates and carrier plate by today and partial assembly, atleast for fixturing, can be completed.
On Tue, Oct 13, 2026 at 3:35 PM Samantha Roman <info@turnpack.com> wrote:
Internal communication: @Ivan Arevalo @Chris Berger @Brandon Benavidez are we ready to close on this task? Due date was 10/09- please advise date change if needed and [...] ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ ͏ @Ivan Arevalo @Chris Berger @Brandon Benavidez are we ready to close on this task? Due date was 10/09- please advise date change if needed and if more time is needed(hours) by COB 10/14
--
Samantha RomanTurnpack — Efficiency Redefined Through Automation | Unfollow
by Ivan Arevalo - 11:42 - 14 Oct 2026