Info Inbox

info@turnpack.com

Re: Paul's H5 packing lists from 3 H5 build



On Thu, Jun 25, 2026 at 8:28 PM George Bloom <reworktech1@gmail.com> wrote:
Hi Lorena,

Here are Paul's 3 packing lists. 1 is a 2 pager:
Paul's 3 H5 Packing lists 2025-2026.pdf

Please note this is what Paul still has on HIS inventory shelf:
1   H5BABP01    Baseplate
2   H5BAFR03    Connector Walls
1   H5BAFR04    Upper Shelf
1   H5CACH01   Chassis Plate

Here is the only part in Turnpack's inventory on my shelf:
1   H5BAFR06 Lower Shelf

Then of course, there are the 3 sets of Paul and Turnpack parts that went into the 3 H5 machines.

It would have been helpful here, if Turnpack sent me packing lists with the parts sent to me or Coating Systems.

Let me know how else I can help wrap this up.

Thanks,
George

by George Bloom - 08:56 - 25 Jun 2026